Tuesday, 15 June 2010

Progress Continues on Pace

Progress continues on pace with the mid October completion date as the final walls are being completed and the building is just about fully enclosed.  All of the major parts of the Parish Life Center (PLC) are coming to life and the walkways and connector points to the existing facilities are taking shape.
 
Above is the walkway that connects the existing Emmaus House backyard to the second floor of the PLC.  In addition to looking beautiful, this walkway will allow for easy access for Father Samuel, our new priests and the staff.
 
The high point in the picture above is the outline of our new Adoration Chapel. The roof is complete and it is ready for the outside skin.
 
This photo above shows the inside of our new Fellowship Hall looking to the south into the Youth Center area.  As you can see much progress is being made as the exterior gets completed and work on the interior begins next month.

In the above picture, supporting structures are raised as the skeleton of the covered walkway connecting the church (via the west facing door) to the PLC.  Notice the beautiful Emmaus arch design extended out into the walkway and throughout the PLC design.







0 comments:

Post a Comment